TITLE:
title
APPROVAL OF A SUMMARY VACATION OF EXCESS RIGHT-OF-WAY AT 296 EAST 19TH STREET
end
DEPARTMENT: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
PRESENTED BY: RAJA SETHURAMAN, PUBLIC WORKS DIRECTOR
CONTACT INFORMATION: SEUNG YANG, P.E., CITY ENGINEER (714) 754-5335
RECOMMENDATION:
recommendation
Staff recommends the City Council:
Adopt Resolution 2026-xx ordering the summary vacation of a portion of right-of-way at 296 East 19th Street.
Authorize execution of the Quitclaim Deed by the Mayor and the City Clerk.
end
BACKGROUND:
At the request of the property owner, Public Works staff has reviewed a request to vacate excess right-of-way at 296 East 19th Street (Attachment 1).
Previous City and County Master Plans of Highways designated East 19th Street as a 4-lane highway; however, the Master Plan designation of the street was downgraded to a 2-lane collector street. As a result, the previously dedicated right-of-way required to construct a 4-lane highway is no longer required. Presently, East 19th Street has been constructed to meet the current Master Plan and Streets and Highways capacity requirements.
ANALYSIS:
In accordance with the prior Master Plan in 1977, 23.00-by-49.27-foot of right-of-way along East 19th Street was dedicated by Parcel Map, as shown and filed in Book 98, Pages 21 and 22. East 19th Street at this location was not improved to the full dedication width and was subsequently downgraded to a collector street, creating excess right-of-way.
Currently, there are no utilities within this portion of the public right-of-way, and therefore, a reservation for a utility easement is not required. The Engineering and Transportation Services Divisions, as well as the Active Transportation Committee (ATC), have reviewed the excess right-of-way. It was determined that East 19th Street is classified as a Class III bicycle facility, and consequently additional right-of-way is not required for any motorist and non-motorist usage. Attachment...
Click here for full text