TITLE:
title
ACCEPTANCE OF THE TRAFFIC SIGNAL MODIFICATION AT BAKER STREET AND BABB STREET PROJECT, CITY PROJECT NO. 24-02
end
DEPARTMENT: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
PRESENTED BY: RAJA SETHURAMAN, PUBLIC WORKS DIRECTOR
CONTACT INFORMATION: SEUNG YANG, P.E., CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
recommendation
Staff recommends the City Council:
1. Accept the work performed by Crosstown Electrical & Data, Inc., 5454 Diaz Street, Irwindale, CA 91706, for the Traffic Signal Modification at Baker Street and Babb Street Project, City Project No. 24-02, and authorize the City Clerk to file the Notice of Completion.
2. Authorize the City Manager to release the retention monies thirty-five (35) days after the Notice of Completion filing date; release the Labor and Material Bond seven (7) months after the filing date; and release the Faithful Performance Bond one (1) year after the filing date.
end
BACKGROUND:
On June 18, 2024, the City Council awarded a construction contract to Crosstown Electrical & Data, Inc., for the Traffic Signal Modification at Baker Street and Babb Street Project, City Project No. 24-02.
The project modified the traffic signal at the intersection of Baker Street and Babb Street and provided protected-permissive left turn phasing for eastbound and westbound traffic along Baker Street. Construction improvements included furnishing and installing new traffic signal poles and foundations, new traffic signal heads with yellow retroreflective border backplates, new Accessible Pedestrian Signal (APS) push buttons, new countdown pedestrian signal heads, as well as new pull boxes, traffic signal conduit and signal wiring. Construction also included concrete sidewalk and curb ramp installations and the relocation of existing traffic signal equipment.
ANALYSIS:
The construction of the project is now complete and a fully functional and operating traffic signal system is installed and in place. The work required by the...